Professional Beverage Dispensing Equipment — OEM/ODM Available

Pre-installation Conditions, Space and Interface Requirements for Commercial Cola Machines | Yuanyin

6/1/2026

I. Site Requirements Before Commercial Cola Machine Installation
  • Countertop Load-bearing Requirements

  • A flat and hard countertop must be used.
    Recommendations:
    Load-bearing capacity ≥150kg
    It is recommended to reserve a 7cm threading hole
    An unstable countertop or insufficient load-bearing capacity can easily affect the long-term stable operation of the equipment.
  • Heat Dissipation Space Requirements

  • Recommendations:
    Distance from the back to the wall ≥10cm
    Top reserved space ≥40cm
    Insufficient heat dissipation will cause:
    Decreased cooling effect
    Increased compressor load
    Increased failure rate
    Especially in high-temperature catering environments, sufficient heat dissipation space must be reserved.
  • Placement Environment Requirements

  • The equipment should avoid:
    Direct sunlight
    High-temperature areas
    Heavy oil smoke environments
    It is recommended to place it in a ventilated and dry area.
    A reasonable installation environment can improve the operational stability of the equipment.
    II. Commercial Cola Machine Entry and Handling Requirements
  • Channel Size Requirements

  • The net width of the equipment handling channel is recommended to be ≥50cm.
    Key confirmations:
    Door width
    Elevator size
    Corridor corners
    Avoid the situation where the equipment cannot be normally moved into the store after arrival.
  • Handling Precautions

  • The equipment must be transported upright.
    Prohibited:
    Lying flat
    Tilting
    Inverting
    Otherwise, it may cause damage to the refrigeration system.
    III. Water and Electricity Reservation Standards for Commercial Cola Machines
  • Power Requirements

  • The equipment must use:
    220V
    10A
    Independent grounded three-hole socket
    At the same time:
    Socket distance ≤1 meter
    Prohibited to use power strips and extension cords
    Independent circuits are more suitable for long-term stable operation of commercial equipment.
  • Water Inlet Requirements

  • Recommendations:
    Inlet water flow 5-6L/min
    Use 4-point external thread angle valve
    Confirming the water source location in advance can reduce later renovation costs.
    IV. Syrup and CO₂ Cylinder Placement Requirements
  • Syrup Bag Placement

  • It is recommended that the syrup bag be within 1 meter of the equipment.
    Can be placed in:
    Side of the equipment
    Lower cabinet
    Too far a distance may affect the stability of liquid feeding.
  • CO₂ Cylinder Placement

  • The cylinder must:
    Remain upright
    Stay away from heat sources
    Be placed in a ventilated area
    Standardized placement can reduce later use risks.
    V. Pipeline Laying Requirements
    All pipelines must maintain a natural arc.
    Prohibited:
    Bending
    Flattening
    Squeezing
    Rolling
    Otherwise, it may easily cause:
    Abnormal cup dispensing
    Liquid leakage
    Air leakage
    Syrup not feeding
    Standardized pipeline laying can reduce later failure rates.
    FAQ
    Q1: Can commercial cola machines be installed without drainage?
    Jianbo L series and Xiangbing Shuang S series do not require pre-reserved drainage and can be installed and used directly. They are more suitable for scenarios such as hamburger restaurants, fried chicken restaurants, tea shops, and small catering stores.
    Q2: Does the equipment require an independent socket?
    An independent socket must be used to avoid sharing the circuit with high-power equipment.
    Q3: Can the cylinder be laid down?
    No.
    CO₂ cylinders must be placed upright.
    Q4: Can the equipment be placed directly against the wall?
    No, heat dissipation space must be reserved.